No games match these filters
Loosen a filter, or start over.
Half finalConference
1H spread
—
no 1H line yet
1H total
—
model 79.3
Projected
40–39
✗ GB lost
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 65.1
Projected
31–34
✗ ECU lost
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 73.0
Projected
31–42
✓ VT won
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 67.7
Projected
33–35
✓ RGV won
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 71.3
Projected
32–40
✗ ISU lost
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 73.5
Projected
30–44
✓ MIZ won
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 69.4
Projected
30–39
✓ SYR won
Half finalNon-conference
1H spread
—
no 1H line yet
1H total
—
model 70.7
Projected
38–33
✓ NDSU won
| Status | Matchup | Spread | Total | Model line | Spread edge | Model total | Total edge | Win prob | Model | |
|---|---|---|---|---|---|---|---|---|---|---|
| Half final | 2-7 · #226 2-8 · #340 |
— | — | GB -1.5 | — | 79.3 | — | 57% GB | › | |
| Half final | 3-5 · #259 2-6 · #145 |
— | — | ECU -2.8 | — | 65.1 | — | 62% ECU | › | |
| Half final | 2-5 · #215 8-2 · #68 |
— | — | VT -11.4 | — | 73.0 | — | 89% VT | › | |
| Half final | 4-3 · #257 2-5 · #287 |
— | — | RGV -1.6 | — | 67.7 | — | 57% RGV | › | |
| Half final | 8-1 · #43 9-0 · #13 |
— | — | ISU -8.1 | — | 71.3 | — | 81% ISU | › | |
| Half final | 2-6 · #302 8-2 · #54 |
— | — | MIZ -13.9 | — | 73.5 | — | 94% MIZ | › | |
| Half final | 5-3 · #114 5-3 · #63 |
— | — | SYR -8.8 | — | 69.4 | — | 83% SYR | › | |
| Half final | 5-3 · #213 3-6 · #329 |
— | — | NDSU -4.3 | — | 70.7 | — | 68% NDSU | › |
The model’s 1st half is fitted from its full-game numbers and past halves; ESPN posts no 1st-half lines for college games. The # beside a record is the team’s power rank today, from the Rankings; AP is the poll. Spread is the market line (the favorite shows the minus). Model line and Model edge are from the model, never the market. Lines are pre-tip-off: after tip-off a tile shows the closing line. Model record